Optimisation of Irrigation Duration

Determine watering duration from plant demand, effective rainfall, soil water balance and measured application rate.
ATLAS × ESTRON · Smart landscape irrigation

From field data to controlled irrigation.

Determine watering duration from plant demand, effective rainfall, soil water balance and measured application rate.

How it works

Reference evapotranspiration is not a runtime. Calculate net demand from the root-zone water balance, convert to gross depth using application efficiency, and derive runtime from application rate or the flow-area relationship. Use cycle-and-soak where slope or infiltration requires it.

Data used

ET₀; crop/landscape coefficient; net water requirement; application efficiency; precipitation rate in mm/h or zone flow.

ESTRON landscape irrigation software / hardware
Estron product/application image. Screen values are example/test data.

Design and commissioning

Define scope by evaluating site topology, planting and soil, selected devices, sensors and software version together. For retrofit projects, establish valve/coil compatibility, measurement points, communication coverage and operational responsibilities during the survey.

Example: 4 mm gross requirement / 12 mm/h application rate = 20 minutes. This illustrates the calculation and is not a site setting.

Keep measured and estimated data distinct. Remote-command execution timing depends on device mode, connectivity and communication intervals.
Development roadmap

The next step

Closed-loop scheduling that updates runtime from actual flow and moisture feedback while accounting for forecast uncertainty.

This section describes development and project-specific integration objectives. It is not a claim of standard product availability or guaranteed performance; implemented functions are defined in the quotation and acceptance criteria.

Applications

Municipal parks, public gardens, university campuses, industrial-zone landscapes, residential estates, hotels, sports facilities and road medians. As zone and site counts grow, standard asset records, traceable actions and measured management become essential.

Plan your landscape irrigation project with us.

Share the site area, valve count, existing connectivity and project objectives. We can define device selection, coverage survey, integration and pilot requirements together.

Request a project quotationContact our technical team

Explore all landscape irrigation solutions

System and Project Design
System and Project Design
Data and monitoring

ET₀; crop/landscape coefficient; net water requirement; application efficiency; precipitation rate in mm/h or zone flow.

Commissioning

Example: 4 mm gross requirement / 12 mm/h application rate = 20 minutes. This illustrates the calculation and is not a site setting.

Integration scope

Engineered to the selected hardware, sensors, software version and site survey. Roadmap capabilities require a separately defined scope.

Similar Products

Pump Operation Optimisation

Flow and Pressure Optimisation

ATLAS ve ESTRON merkezi peyzaj sulama dashboardu, vana ve batarya izleme ekranı

Energy-Saving Scenarios

Size Nasıl Yardımcı Olabiliriz?